The European Parliament in Strasbourg

Information about project
Category : TV studios
Year : 2015
Client : The European Parliament
Tags :
Brussels , Light , Lighting , Media , Sound , Strasbourg , video
Détail du projet

Inytium now also present in the European Parliament! The contract signed by and between the audiovisual unit of the European Parliament and Inytium comprises the supply of audiovisual and lighting equipment with a large proportion of low power consumption spotlights, and also the installation of the lighting structures for two TV studios, one in Brussels […]

SHARE:
More information

Inytium now also present in the European Parliament!

The contract signed by and between the audiovisual unit of the European Parliament and Inytium comprises the supply of audiovisual and lighting equipment with a large proportion of low power consumption spotlights, and also the installation of the lighting structures for two TV studios, one in Brussels (in progress) and the other in Strasbourg.

These two installations should provide MEPs and journalists easier access to the media thanks to the central location chosen to install these two facilities, namely at Level 3 of the ASP building in Brussels and the lobby of the Strasbourg Chamber. They entail mainly round and interview tables, organized in strategic places of the buildings to capitalize on a natural setting and the ambiance of the moment.

For Strasbourg, Inytium designed the structure according to the specific requests of the Parliament, managed the load studies, installed and commissioned all the equipment concerned (hoisting structures, square bridge structures, power and control cables, dimmers, electric switchboards), in compliance with the very strict security and aesthetic constraints of the premises.

image
https://inytium.com/wp-content/themes/larch/
https://inytium.com/en/
#64b41e
style5
scroll
Loading posts...
/home/u209563432/domains/inytium.com/public_html/
#
off
none
loading
#
Sort Gallery
on
on
on
off
Enter your email here
on
off
en