New tools for the RTBF
Tags :
Audiovisual , Dimmer , studio , TV , WiringInytium won an invitation to tender for the audiovisual renovation of Studios 2 and 4 of the Reyers site as well as for the sale and installation of the brand new audiovisual infrastructure of Media Rives, a versatile 1200 m² studio, which also happens to be the largest of the Wallonia-Brussels Federation. The practical details […]
Inytium won an invitation to tender for the audiovisual renovation of Studios 2 and 4 of the Reyers site as well as for the sale and installation of the brand new audiovisual infrastructure of Media Rives, a versatile 1200 m² studio, which also happens to be the largest of the Wallonia-Brussels Federation.
The practical details of this project – a formidable challenge we met hands down – are provided below.
Studio 2 (400M²) and Studio 4 (400m²) on the Boulevard Reyers in Brussels.
Removal of the existing installations
Engineering, layout
Electrical wiring
Network wiring (Ethernet & DMX)
Distribution boards (14 boards – General supply of 315 KVA)
Eurodim Twintech dimmer cabinets from ADB with no fewer than 160 3/5 Kw circuits for studio 2 and 304 3/5 Kw circuits for studio 4.
Installation of 80 motorised carriers, from ADB, + control system for studio 4
Control systems
Certification and commissioning of the installation
Studio 40 (1200M²) / Liège Médiacité (in progress)
Engineering, layout
Electric wiring
Network wiring (Ethernet & DMX)
Distribution boards (8 boards – General supply of 1250 KVA)
Eurodim Twintech dimmer cabinets from ADB with 168 3/5 Kw circuits
Control systems
Installation of a lifting infrastructure comprising 44 Chain Master hoists of one tonne each
Certification and commissioning of the installation